Work will be done in Birmingham, Westtown, West Goshen Townships
The Pennsylvania Department of Transportation (PennDOT) has announced the following area roadwork this week – weather permitting – so that motorists can anticipate potential travel delays.
Drivers on U.S. 202 in both directions in Westtown, West Goshen and Birmingham Townships will experience intermittent lane closures as crews work on patching between Bridge Road and Paoli Pike. The work will be done from 9 a.m. to 3 p.m. from Monday, March 10, through Friday, March 14.
Crews will be working on bike-lane installation on Kennett Pike (Rt. 52) from Monday, March 10 through July from 9 a.m. to 3 p.m. and 7 p.m. to 6 a.m. Lane closures will be in effect between U.S. 1 and Hickory Hill Road.
Wawaset Road in Pocopson Township between Lenape-Unionville and Corinne Roads will be closed until Sept. 26 for road reconstruction. Detours are posted.
Work will continue to cause lane restrictions on U.S. 1 in Concord Township, where crews are working on driveway and curb installation between U.S. 322 and Evergreen Drive. The work will be done from 9 a.m. to 3 p.m. through June 30.
To report potholes and other roadway maintenance concerns on state roads, call 1-800-FIX ROAD.